HVAC installation
In Brooklyn
PROFAIR CORP offers installation taking into account all SMACNA standards.
• HVAC Equipment • Controls • Ductwork • Mechanical Piping
• HVAC Equipment • Controls • Ductwork • Mechanical Piping
Ventilation and air conditioning system
Our company PROFAIR CORP is engaged in the installation and maintenance of turnkey ventilation and air conditioning systems in Brooklyn at various facilities.
Highly qualified specialists, a powerful material and technical base and extensive experience in project implementation are the key to our successful completion of tasks of any level of complexity.
Installation and design of engineering systems is a necessary element of both industrial buildings. The engineering network directly affects the functioning of any building, whether it is an office or a production workshop. The main task of ventilation is to remove unpleasant odors and stagnant air from the room. An improperly designed heating, air exchange or air conditioning system can lead to an increase in humidity or dry the air, resulting in a large amount of dust or mold. Comfort, as well as people's health, directly depends on the correct installation of communications. Installing, and even more so designing a ventilation system is a difficult task, so it is impossible to do it competently without professional skills and knowledge.
Installation of ventilation includes installation, connection and strapping of equipment according to the working documentation. Installation works of automation and control systems are carried out.
At the next stage, all previous actions of the masters are summarized and installation quality control is carried out, including all equipment indicators and comparing them with the design values. The compliance of the system with the established norms and rules is also carried out.
In the process of these works, employees responsible for the implementation of the project participate. The following tasks are performed at the control stage:
Commissioning takes place after the completion of installation work and is the last stage before commissioning the equipment to the customer.
At the next stage, all previous actions of the masters are summarized and installation quality control is carried out, including all equipment indicators and comparing them with the design values. The compliance of the system with the established norms and rules is also carried out.
In the process of these works, employees responsible for the implementation of the project participate. The following tasks are performed at the control stage:
- the customer checks the quality of the work performed as a whole;
- the designer checks for errors or discrepancies with the project;
- engineers make a technical report in accordance with the rules and regulations.
Commissioning takes place after the completion of installation work and is the last stage before commissioning the equipment to the customer.
We work within the budget of each project and provide the customer with complete information about the expenditure of funds at each stage of the project. If it is possible to optimize costs, we always use it in agreement with the client, so our turnkey ventilation is always the best price and quality.
Our recent works
Get professional advice from a specialist for free.
CONTACT
Address
542 3rd avenue, Brooklyn, NY, 11215
estimatingprofair@gmail.com profairhvac@gmail.com
Mobile
+1 (347) 733-8802
Office
+1 (646)764-3280